This is the AIRS, AMSU-A, and HSB weekly operations status report for Friday, February 6, 2026 (the end of week 1240 of the Aqua mission). AIRS: The AIRS instrument remains healthy with all voltages, currents, and temperatures as expected. AMSU-A1: AMSU-A1 is healthy except for channels 4, 5, 6, and 7. AMSU-A2: AMSU-A2, which provided channels 1 and 2 of the AMSU-A suite, suffered a non-recoverable loss of power on September 24, 2016 and is no longer operational. HSB: HSB has been non-operational since February 2003 due to a scanner anomaly. Instrument activities since previous report: There were no instrument activities this past week. Upcoming events: 1) An AIRS photometric calibration test is scheduled for Saturday, February 7. Here is the timeline (UT): 038/19:01:00 Photocal Lamp 1 On (S/C night) 038/19:09:00 Photocal Lamps Off (S/C night) 038/19:51:00 Photocal Lamp 1 On (S/C day) 038/19:59:00 Photocal Lamps Off (S/C day) 038/20:40:00 Photocal Lamp 2 On (S/C night) 038/20:48:00 Photocal Lamps Off (S/C night) 038/21:29:00 Photocal Lamp 2 On (S/C day) 038/21:37:00 Photocal Lamps Off (S/C day) 038/22:19:00 Photocal Lamp 3 On (S/C night) 038/22:27:00 Photocal Lamps Off (S/C night) 038/23:08:00 Photocal Lamp 3 On (S/C day) 038/23:16:00 Photocal Lamps Off (S/C day) Daily plots of noise levels for each AIRS channel are available on the AIRS webpage at https://airs.jpl.nasa.gov/mission/instrument-operations/. A link there currently points to where the files are hosted at https://airsnrt.jpl.nasa.gov/nedt_trends/html/airs_channel_nedt_trends.html. For each channel there are plots for the whole AIRS mission and for the last 2 months. Going forward, weekly Ops status updates will be archived at the same webpage above, and are hosted at https://airsnrt.jpl.nasa.gov/report/latest and https://airsnrt.jpl.nasa.gov/report/archive/. ================================================================== William Mathews - AIRS Instrument Operations NASA / Jet Propulsion Laboratory