This is the AIRS, AMSU-A, and HSB weekly operations status report for Friday, November 29, 2024 (the end of week 1177 of the Aqua mission). Please note the list of AIRS channels with upcoming gain changes. AIRS: The AIRS instrument remains healthy with all voltages, currents, and temperatures as expected. AMSU-A1: AMSU-A1 is healthy except for channels 4, 5, 6, and 7. AMSU-A2: AMSU-A2, which provided channels 1 and 2 of the AMSU-A suite, suffered a non-recoverable loss of power on September 24, 2016 and is no longer operational. HSB: HSB has been non-operational since February 2003 due to a scanner anomaly. Instrument activities since previous report: There were no instrument activities this past week. Upcoming events: 1) A new Optimum (normal operations) gain & circumvention table will be uploaded. The table has been generated. Here is a list of channels whose A/B weights will change in the new table. Weather and L2 channels are noted. 284 288 292 294 312 328 329 332 344 390 408 430 473 476 576 596 597 606 627 649 691 740 814 821 849 860 864 878 882 883 912 946 983 995 1003 weather 1018 1032 1041 1100 1106 1113 1143 1146 1187 1253 1257 1310 1384 1402 weather 1766 weather 1793 1839 1889 1925 1929 2009 2036 2053 2069 2122 weather, L2 2163 L2 2193 L2 2202 L2 2212 L2 2235 2294 2) An AIRS photometric calibration test is scheduled for Saturday, December 7. Here is the timeline (UT): 342/19:04:00 Photocal Lamp 1 On (S/C night) 342/19:12:00 Photocal Lamps Off (S/C night) 342/19:54:00 Photocal Lamp 1 On (S/C day) 342/20:02:00 Photocal Lamps Off (S/C day) 342/20:43:00 Photocal Lamp 2 On (S/C night) 342/20:51:00 Photocal Lamps Off (S/C night) 342/21:32:00 Photocal Lamp 2 On (S/C day) 342/21:40:00 Photocal Lamps Off (S/C day) 342/22:22:00 Photocal Lamp 3 On (S/C night) 342/22:30:00 Photocal Lamps Off (S/C night) 342/23:11:00 Photocal Lamp 3 On (S/C day) 342/23:19:00 Photocal Lamps Off (S/C day) 3) An AIRS guard test is scheduled for Tuesday, December 10. Here is the timeline (UT): 345/22:40:00 AIRS Guard Test begins (AIRS in CHECKOUT mode) 345/23:07:00 AIRS back in OPERATE mode 4) MODIS Lunar Calibration roll #240 is scheduled for Thursday, December 12. Here is the timeline (UT): 347/20:32:00 AIRS put into READY mode prior to Lunar Cal 347/20:54:00 AIRS back in OPERATE mode Daily plots of noise levels for each AIRS channel are available on the AIRS webpage at https://airs.jpl.nasa.gov/mission/instrument-operations/. A link there currently points to where the files are hosted at https://thunder.jpl.nasa.gov/nedt_trends/html/airs_channel_nedt_trends.html. For each channel there are plots for the whole AIRS mission and for the last 2 months. Going forward, weekly Ops status updates will be archived at the same webpage above, and are hosted at https://airsteam.jpl.nasa.gov/report/latest and https://airsteam.jpl.nasa.gov/report/archive/. ================================================================== William Mathews - AIRS Instrument Operations NASA / Jet Propulsion Laboratory