This is the AIRS, AMSU-A, and HSB weekly operations status report for Friday, July 26, 2024 (the end of week 1160 of the Aqua mission). AIRS: The AIRS instrument remains healthy with all voltages, currents, and temperatures as expected. AMSU-A1: AMSU-A1 is healthy except for channels 4, 5, 6, and 7. AMSU-A2: AMSU-A2, which provided channels 1 and 2 of the AMSU-A suite, suffered a non-recoverable loss of power on September 24, 2016 and is no longer operational. HSB: HSB has been non-operational since February 2003 due to a scanner anomaly. Instrument activities since previous report: An AIRS OBC float calibration test started yesterday, Thursday, July 25. The test will conclude tomorrow, Saturday, July 27. Here is the timeline (UT): 207/17:00   Set AIRS opmode to READY 207/17:00   Load calibration gain table to AIRS 207/17:01   Turn OBC heater off 209/04:20   Rotate scan profile to OBC 209/04:45   Rotate scan profile to nadir 209/05:00   Turn OBC heater on 209/21:00   Load Optimum (nominal) gain table to AIRS 209/21:01   AIRS back in OPERATE mode Upcoming events: 1) An AIRS photometric calibration test is planned for Wednesday, August 7. This activity has not been scheduled yet. 2) A new Optimum (normal operations) gain & circumvention table will be uploaded. The upload has not been scheduled yet. Daily plots of noise levels for each AIRS channel are available on the AIRS webpage at https://airs.jpl.nasa.gov/mission/instrument-operations/. A link there currently points to where the files are hosted at https://thunder.jpl.nasa.gov/nedt_trends/html/airs_channel_nedt_trends.html. For each channel there are plots for the whole AIRS mission and for the last 2 months. Going forward, weekly Ops status updates will be archived at the same webpage above, and are hosted at https://airsteam.jpl.nasa.gov/report/latest and https://airsteam.jpl.nasa.gov/report/archive/. William Mathews - AIRS Instrument Operations NASA / Jet Propulsion Laboratory